Steelray Project Viewer 5.2.20.28


Notes

RELEASE 5.2.20.28 6/16/14
Fix for UN/CEFACT files not supplying Start, Finish or UniqueId’s
Fix for displaying subprojects within subprojects
Fix for detecting correct type for work, material, cost in Project 2013

Steelray Project Exporter (SPX) Release v1.4.8.3


The following are changes for SPX version 1.4.8.3:
Bug fix for fatal exception when canceling the export.
Bug fix for predecessors and successors in a project with subprojects.
Bug fix for hiearchial structure in a project with subprojects.

Steelray Project Viewer RELEASE 5.2.18.26


Support for Font Substitution in Windows
Fix for some network paths recognized as invalid
Added support for Steelray classic version in the install
Bug:  Enterprise custom column was renaming finish
Fixed Out of Memory error upon reading Project 2013 file
Fixed reading Predecessors in Project 2010 and 2013
Fixed bug displaying correct foreground text color in Gantt
Fixed bug of rare exception within Project 2010 data

Steelray Project Exporter (SPX) v1.4.7.2


The following are changes for SPX version 1.4.7.2:
Added a new combo box under the Miscellaneous tab in Task Configuration for Assessed % Complete.
Fixed an issue where the “Check For Updates” functionality wasn’t working.

Introducing the Report Gallery in Project Analyzer


Version 4.0 of Steelray Project Analyer has added a report gallery. The gallery is a visual representation of all of the reports available within Project Analyzer. Each thumbnail provides a basic visual of what the report provides. More information can be obtained at a glance by hovering over each thumbnail.

Select a report with a single click. When a report is selected, detailed information about the report is displayed along with a mock up of the output. When a report is added, the configuration screen for that report is brought up (if necessary) and a progress indicator denotes when the configuration is complete.

Steelray Project Exporter (SPX) v1.4.5.0


The following are changes for SPX version 1.4.5.0:

Minor changes to meet DEI Standards:

  • Limited number of characters of Name field to 60 for Project Schedule Tasks.
  • Removed duplicated RequiredProjectResource ID.
  • Modified UserDefinedProject notes to DEI Standard
  • Added ProjectNote element to identify exporter version used on xml file.

Fix for case when project name and folder cannot be found.

Modified error messages.

Analyzer 3.5 Adds Validation for Microsoft Project


Steelray Software today announced the general availability of version 3.5 of Steelray Project Analyzer.

Version 3.5 adds a new Validator report which analyzes  Microsoft Project schedules for corruption and other data integrity issues.

With an integrated master schedule (IMS), it is common to link to tasks in external sub-projects or to have sub-project tasks link to other sub-project tasks. Since sub-project files can be opened independently of their master schedule, links between files can become invalid.  It is important to have a way to quickly identify issues with the IMS as a whole that could invalidate your critical path.

About Steelray Project Analyzer

Steelray Project Analyzer is the leading software solution for project schedule analysis.  Steelray pioneered this software genre in 2007 with the introduction of  its Analyzer product.  Analyzer was the first commercial software to implement DCMA’s 14 Point Assessment, which has widespread use in organizations practicing Earned Value Management.  Analyzer has full support for the UN/CEFACT XML standard used for the exchange of project cost and schedule data.

About Steelray Software

Headquartered in Atlanta, Ga., Steelray Software is a leading provider of business intelligence software for project management. Specifically, they concentrate on advancing the state of the art in project cost and schedule visualization and analysis. They were founded in 2000 and are a privately held company.

Javelin is Here!


We are proud to announce the first release our latest product:  Steelray Javelin.

What is Javelin?

Javelin is desktop software that provides the state of the art in project schedule visualization and analysis. In Javelin, the viewer, the analyzer, and the reporter are all one and the same. Javelin’s main focus is to provide a simple way to view and understand the “ground truth” in large project data sets.

How is Javelin Different?

While some software applications provide cost analysis, and others provide schedule analysis, Javelin provides a true integrated analysis (merged cost and schedule). Javelin’s power lies in the the comparison and reconciliation of the two sets into one analysis.

 

Check out our new look in v3.4!


Summary of Changes (because we’re more than just a pretty face!)

  • New Feature - Criteria Category Manager Editor
    • Quickly add or remove criteria from categories.
    • Create your own categories
  • Added support for Remaining Duration field in Primavera P6
  • Allowed analysis even when resource name is blank.
  • Fixed a problem in overall score when the scorecard consisted entirely of compliant/non-compliant scores